top of page
PS_front_elevation_perspective.png
BG Christian Academy

Religious, educational

Bowling Green,

OH

Location:

2025

Year:

75,000 SF

total sf:

25,000

phase 1 sf:

mADE designers have created a phased masterplan that allows for BG Christian Academy to gradually add programming as their needs change.

Addressing an immediate need for elementary school space, phase 1 adapts and grows with the student population. The programming of the floorplan can shuffle, changing multi-use spaces out for classrooms as the students work their way towards high school.

BG Christian Academy narrowed down the designs mADE presented them with to two options so far.

A clerestory and a split-gable design, which are both are displayed below. 

Split Gable Design

PS_front_elevation_perspective.png

Clerestory Design

cc_front_elevation_perspective.png

Related Projects

Religious

bottom of page